Markings to Roadway – Sussex
Following a recent installation of a new building, client needed a pedestrian crossing to go across roadway. It was almost impossible to close the area off – as it is very busy site, so we applied thermoplastic material to the surface – this is quick drying. We only completed white pads – black pads are not always necessary. An adhesive was applied first before the hot thermoplastic material – as it was a block paved surface.